Airports & Aviation · Stormwater Management
Neoloy® Tough-Cells reinforced two stormwater retention ponds at Gatwick Airport, protecting water sources from fuel and de-icing runoff.
Gatwick Airport required two stormwater retention ponds to manage runoff containing fuel, de-icing fluids and other chemicals. Conventional steel-reinforced concrete was vulnerable to corrosion and required extensive formwork. The lining also needed to withstand high water flows and wave action on steep 1:3 slopes formed over weathered Weald clay, while accommodating movement without extensive cracking.
Neoloy® Tough-Cells provided a flexible concrete lining without conventional steel reinforcement. Installed over a separation geotextile and filled with 25 MPa dry lean concrete, the cellular confinement system formed a reinforced mattress of interconnected concrete segments, accommodating movement through localized microcracking rather than continuous transverse cracks.
The solution offered a practical alternative to traditional reinforced concrete for chemically exposed stormwater infrastructure.
Environmental Protection
The two stormwater retention ponds manage airport runoff through separate treatment pathways. The contaminated runoff is pumped to water treatment facilities, while water from the clean pond is directed to balancing ponds for natural filtration.
This approach helps protect surrounding water sources, allowing treated and filtered water to be discharged at acceptable environmental quality. Protective netting also helps keep waterfowl away from airport operations.