Neoloy® Tough-Cells Installation

Why Correct Installation Matters

An optimized Tough-Cells design is only as strong as its installation. The correct Neoloy® category, cell geometry and layer configuration can still underperform if layout, infill, fastening or compaction differ from the approved design.

That is why PRS treats installation as part of the engineering process, providing guidance to help the project team build the solution as designed.

How Tough-Cells Installation Works

While installation details vary by application and approved design, Neoloy Tough-Cells projects generally follow five core stages.

01
Stage 01

Site Preparation

Prepare the work area and subgrade in accordance with the approved design, including specified geosynthetics where required.

02
Stage 02

Layout & Positioning

Position Tough-Cells sections according to the approved layout, alignment and project geometry.

03
Stage 03

Expansion & Connection

Expand the cells to the required dimensions and connect adjoining sections to maintain the intended system geometry.

04
Stage 04

Infill / Cover Placement

Place the approved infill or cover material and compact as specified, while protecting the cells during construction.

05
Stage 05

Inspection & Verification

Verify installation geometry, material placement and project-specific quality requirements before progressing.

Project-Specific Installation

Exact installation requirements depend on the application, approved design, site conditions and project specifications. Detailed guidance is provided as part of the project package.

Installation Support from PRS

Support is matched to the project, application, location and crew experience. The objective is to translate the approved design into clear field execution without replacing the contractor’s responsibility for construction and site management

Installation Support

Crew Training

Practical guidance helps installation teams understand the approved layout, handling requirements, connection methods and construction sequence before work begins.

Field Support

Installation Supervision

Technical support can be provided at key construction stages to help verify that the installed system follows the approved design and project requirements.

Safety & Quality

Installation should follow the approved project design, project-specific safety procedures and applicable regulations. PRS guidance supports correct product handling, installation and verification so the engineered configuration is implemented as intended.

From Engineering Design to Installation Support

Start with a project evaluation by our engineering team. Once the solution is designed and optimized for your project, PRS supports the transition from design to field implementation with installation guidance, training and project-specific support.